Read Time:11 Second
“For the avoidance of doubt, the actual cost incurred for the repair and painting works on its main office building was GH¢319,683 and not GH¢5.2 million as alleged,” the statement read.
“For the avoidance of doubt, the actual cost incurred for the repair and painting works on its main office building was GH¢319,683 and not GH¢5.2 million as alleged,” the statement read.